Turbo blower India situation is as follows.
For an operated STP or WWTP plant, electricity cost takes up 50% of total operation cost, of which 70%-80% is aeration blower electricity cost, to lower plant operation cost, blower plays an important rule.
So India water starts to push to use more turbo blower, both air foil turbo blower and maglev centrifugal turbo blower, in the construction, roots blower will be replace by turbo blower.
Not only in India, also in Thailand, China, Malaysia, Indonesia, Philippine, Vietnam, Singapore, Australia, India, Pakistan, Iran, Saudia Arabia, Germany, UK, France, Spain Italy, Turkey, US, Canada, Brazil etc.
